OEM Documentation Checklist
Electrical drawings, I/O list, software, parameters, backups and manuals.

Use this as a project gate
Complete the checklist before final model approval or machine change. Record every assumption and assign an owner for items that still require verification.
- Confirmed by datasheet
- Confirmed by drawing
- Confirmed by bench test
- Confirmed on machine
- Documented for maintenance